Owner: EPCOR

Construction Dates: Dec 2015 – Oct 2019

 

As the prime contractor, Auza Contracting replaced over 20,000’ of 8”, 6”, and 4” waterlines, which service over 350 homes in a large housing community in Surprise, AZ. The project included installation of 45 water valves, 7 fire hydrants, and over 350 water service installations with over 5,000’ of water service lines from water main to meter. Detailed planning and scheduling were required to ensure minimal service disruption to residents while replacing the aging lines. Auza Contracting also removed and replaced over 7,500 SY of asphalt and seal coated over 62,000 SY of roadway during the project.